Civil Precast

Civil Precast

An extensive range of precast concrete products is available for civil engineering applications. Concrete’s inherent durability and the quality of factory produced elements, together with their speed of erection, makes precast concrete components ideal for many challenging environments. From aggressive ground conditions or possession time constraints to limited on-site storage or aesthetically demanding finishes, precast concrete elements provide economic and durable solutions.

Our product offer includes:
Vehicular Bridges – Segmental Boxed Girders, PSPC U-beams, V-beams, T-beams, I-beams, Columns & Crossheads
Pedestrian Bridges – PSPS Beams, PC Staircase.
LRT Projects – Segmental Boxed Girders, PSPC U-beams, V-beams, T-beams, I-beams, Columns & Crossheads
MRT Projects – Segmental Boxed Girders, PSPC U-beams, V-beams, T-beams, I-beams, Columns & Crossheads, Tunnel Segment Linings.
Sewerage Projects – Precast Jacking Pipes, Precast Chamber Shafts,
Drainage & Road Projects – Precast U-drains, Culverts, C7 Drains, V-drains, Road Kerbs

Completed Projects

  • Construction of Yishun Avenue 8 (Part 2) and Vehicular Bridge Across Sungei Simpang Kiri

  • Construction and Completion of Guideway, Stations, Iconic Bridge, Park and Rides, Ancillary Buildings and Other Assosiated Works for Package GS07-08 for Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia

  • Projek Penswastaan Lebuhraya Bertingkat Sungai Besi-Ulu Kelang Package Suke-CB2-Construction Completion of Mainline and Other Associated Works from CH. 15000 to CH. 16700

  • ER529A - Senja/Kranji Expressway (KJE) Interchange

  • Expansion of KPE/TPE interchange including link road to Punggol Central (ER397)

  • Contract ER432 - Widening of Clementi Road and Improvement to Commonwealth

  • Contract ER256 - Design & Construction of Eco-Bridge Across BKE Linking Nature Reserves

  • Construction of Punggol East (Part 4) and Vehicular Bridge Across Punggol Waterway (B) Modification of Punggol Drive / Punggol Place Junction

  • Proposed New Pedestrian Bridge At Marina Bay

  • Contract 912 - Construction And Completion of Vehicular Flyover At Upper Bukit Timah / Woodlands Road

  • CHANGI AIRPORT - TERMINAL 4 (Proposed Erection of A 3-Storey Airport Terminal Building (Terminal 4) with 2 Mezzanine floors. A Basement and a departure Holding area, a 5-storey multi storey carpark, A 2-storey Taxi Holding area, 2 overhead Bridge on Lot 4596M (PT),4594L(PT), 3622W(PT), 1301C(PT), 1328L(PT), 3375T(PT), 1327X(PT), and 1298K(PT), MK31, 5838N(PT), 5835T(PT) and 7297N(PT) MK at Airport Boulevard (Chaingi Planning Area)

  • Proposed Construction of new Taxi Deck, Vehicular Bridges, Ramps and Associated Works at Singapore Changi Airport

  • Project Mass Rapid Transit Lembah Kelang : Jajaran Sungai Buloh-Kajang
    Package V8 : Construction & Completion Of Viaduct Guideway and Other Associated Works From Taman Mesra to Kajang Station.

  • Project Mass Rapid Transit Lembah Kelang : Jajaran Sungai Buloh-Kajang
    Package V1 : Construction & Completion Of Viaduct Guideway and Other Associated Works From Sg. Buloh to Kota Damansara Station

  • Project Mass Rapid Transit Lembah Kelang : Jajaran Sungai Buloh-Kajang
    Package V4 : Construction & Completion Of Viaduct Guideway and Other Associated Works From Section 17 to Semantan Portal-MRT

  • Project Mass Rapid Transit Lembah Kelang : Jajaran Sungai Buloh-Kajang
    Package V2 : Construction & Completion Of Viaduct Guideway and Other Associated Works From Kota Damansara Station to Dataran Sunway Station – Special Span

  • Project Mass Rapid Transit Lembah Kelang : Jajaran Sungai Buloh-Kajang
    Package V1 : Construction & Completion Of Viaduct Guideway and Other Associated Works From Sg. Buloh to Kota Damansara Station

  • A53 -LRT Kelana Jaya (KLJ) Line Extension Project (Pkg A)