Client:
Hwa Seng Builders Pte Ltd
Project Title:
CHANGI AIRPORT - TERMINAL 4 (Proposed Erection of A 3-Storey Airport Terminal Building (Terminal 4) with 2 Mezzanine floors. A Basement and a departure Holding area, a 5-storey multi storey carpark, A 2-storey Taxi Holding area, 2 overhead Bridge on Lot 4596M (PT),4594L(PT), 3622W(PT), 1301C(PT), 1328L(PT), 3375T(PT), 1327X(PT), and 1298K(PT), MK31, 5838N(PT), 5835T(PT) and 7297N(PT) MK at Airport Boulevard (Chaingi Planning Area)
Scope of Work:
Supply & Delivery of Pecast POB
Completion Date:
May 2016
Similar Projects
Construction and Completion of Guideway, Stations, Iconic Bridge, Park and Rides, Ancillary Buildings and Other Assosiated Works for Package GS07-08 for Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia
Project Mass Rapid Transit Lembah Kelang : Jajaran Sungai Buloh-Kajang
Package V2 : Construction & Completion Of Viaduct Guideway and Other Associated Works From Kota Damansara Station to Dataran Sunway Station – Special Span
Proposed Construction of new Taxi Deck, Vehicular Bridges, Ramps and Associated Works at Singapore Changi Airport